27 Projects · 3 Countries · 14 Years

Real Projects. Real Performance.

Dragon deployments across agriculture, food processing, and industrial manufacturing. Commissioned, monitored, and delivered by Enerama's in-house engineering team.

Large-scale agricultural Dragon deployment
Agriculture & Greenhouses

Large-Scale Greenhouse Deployment

Multi-hectare facility · Türkiye

Challenge

Year-round production of temperature-sensitive crops under extreme summer humidity. Conventional HVAC caused fungal pressure and could not hold stable VPD.

Solution

Dragon Climate Control system sized for multi-hectare coverage. Water recovered from air redirected to irrigation loop. Mekasera SCADA for centralized multi-zone monitoring.

30–60%
Energy reduction vs prior HVAC
Zero
Fungal loss events since commissioning
24/7
Continuous operation under demanding conditions
Industrial food drying facility
Food Processing

Industrial Food Drying Facility

Production plant · Switzerland

Challenge

Energy-intensive drying process with inconsistent product quality due to humidity fluctuations. Product spoilage from mold in humid cycles drove loss rates above tolerance.

Solution

Dragon Liquid Desiccant system precisely controlling drying-chamber dew point. Natural pathogen elimination on contact — no chemical fogging required for sanitation.

40–65%
Drying energy reduction
Consistent
Product quality across production runs
Water
Recovered as byproduct of drying
Industrial facility field operations
Industrial Manufacturing

Precision Manufacturing Climate Control

Production facility · USA

Challenge

Product dimensional tolerances compromised by humidity swings. Worker comfort and corrosion protection demanded consistent RH year-round. Conventional HVAC consumed more than 50% of total facility energy.

Solution

Dragon platform providing independent temperature and humidity control. Integration with plant-wide waste-heat recovery system for desiccant regeneration.

35–55%
Climate control energy reduction
Stable
Humidity within manufacturing tolerances
14 yrs
Field-proven across the platform fleet

Portfolio at a Glance

27
Projects Commissioned
350+
Units Deployed
2,830 kW
Installed Power
11,792 L/h
Water Extraction
14
Years Field-Proven

Want Specific Project References?

Detailed project documentation — including client names, facility specifications, exact performance data, and before/after telemetry — is available under NDA for qualified investors, strategic partners, and serious prospects. Reference site visits can be arranged subject to client confidentiality.

Request Detailed Case Studies →

Could Dragon Deliver These Results in Your Facility?

Share your facility details — our engineering team will model expected performance for your specific conditions.

Request Performance Modeling